The Humboldt Park St. Joseph’s visit went well last week. We met with Lisa and Mickey and discussed their needs and what file types and deliverables we would ultimately turn over to them: a disc with the editable film files, the files of all the collateral and print and a standards manual with their new logo.

The B-roll footage had been conducted at the Austin location, but we will need to schedule the actual interview at Austin once Brian C. talks to the ladies today, as it is filming day for the St. Joe’s Humboldt Park facility and interview of Lisa Sullivan there. Unable to attend this filming, as Video Art Director I posted a PDF of points to the Basecamp wiki for those people to take with them. The film is tentatively scheduled to be logged by Sean on Friday as he has the time to get to the lab that day. Progress is being made, slowly. With only 5 weeks left, I foresee a tighter schedule being given to us from Project Manager Amelia for deadlines, which she has done a great job overseeing.

My concern is that we will not be able to utilize our class time editing and getting this video together outside of class if we are required to be there for attendance and discussion each week. Not everyone is available to collectively work outside of Thursday nights and so striking a balance between “agency worker” and “student of this class” is tenuous at this moment.

In class this Thursday, we plan on narrowing down the logo choices to 3 – 5 drafts to e-mail to St. Joe’s. We hope they will make their selection ASAP once this happens to that we can get the graphics and standards manual team – not to mention the website graphics folks – rolling on their individual projects.

I look forward to pinning down an Austin date for filming and then I will feel better about the timeline of this project. The sooner things get done, the better. The client has virtually given us carte blanche with regards to designs, but I hope they are decisive enough to decide which logo they like the best — and soon.